Express Networks 2

Project Details
Our Client
Bell Building Projects Ltd
Location
Connect House, Henry Street, Manchester
Sector
Residential & Commercial – Refurbishment
Project Completion
October 2022
Services
Fire Remediation, Façade Replacement
Overview
Express Networks 2 is a six-storey mixed-use building in Manchester city centre, originally built as a commercial printing facility before being converted into apartments in the early 2000s. With ground and first-floor commercial units and residential accommodation above, the building remained fully occupied throughout its façade remediation works.
Longworth was appointed by Bell Building Projects to deliver the external fire remediation package — stripping the unsafe cladding and installing a complete non-combustible façade. The updated system includes a VM Zinc standing seam, flat lock and shingle design that carefully replicates the look and layout of the original finish while meeting all updated safety requirements.
Thoughtful Design
Creating spaces with purpose
We believe great design should do more than look good — it should support the people who use it, day in and day out.
Intelligent Solutions
Solving challenges with clarity
From concept through to completion, we think creatively and work collaboratively to deliver smart, buildable solutions.
Reliable Delivery
Built on experience and trust
We manage complexity with confidence — delivering high-quality results on time, on budget, and with minimal disruption.
The Vision
The existing façade system no longer met fire safety standards and needed full replacement. The original Uginox stainless steel material was discontinued, prompting a thorough review of alternatives that could match both performance and appearance.
VM Zinc Natural was selected as the most suitable option — offering a similar aesthetic through its standing seam and flat lock profiles, and developing a natural patina over time to create a soft grey finish. Although the material is initially shiny, the evolving weathered look was welcomed by the client for its depth and character.
Crucially, the works needed to maintain the building’s original architectural intent while significantly improving safety, all without displacing tenants or disrupting the mixed-use occupancy.


Design & Delivery
The project began with full scaffold erection around the building perimeter. Once in place, the existing façade was stripped back to reveal unexpected structural issues — including exposed cables, unsealed voids, and even open visibility into apartments due to missing blockwork.
Longworth worked quickly with the design team and stakeholders to agree a remedial approach. Localised SFS framing was installed where required, followed by RCM Y-wall sheathing and Obex EPDM membranes to reseal the building envelope.
A new non-combustible build-up was then installed, including:
- 150mm Rockwool Duo-Slab insulation
- Firth Steels SR35+ trapezoidal decking
- Corofil cavity fire barriers
- VM Zinc cladding – standing seam, flat lock and shingles fabricated off-site at Longworth’s Haydock facility
The zinc panels were installed with stainless steel clips and fixings into the new substrate, while curved building corners were finished with zinc shingles to mirror the original design. Operatives worked carefully alongside scaffold teams to ensure all tie-in areas were finished as the scaffold was removed.
Given the occupied nature of the building, communication with residents was essential. Site managers coordinated closely with tenant liaison officers, sharing look-ahead plans and ensuring noise and working hours were carefully managed around apartment access points.
Despite a 30% increase in the original contract value — driven by unforeseen structural repairs — the project was delivered successfully and led to further collaborations with both Bell and Thomasons on future schemes.
Start Your Project
Start Your Project
Choose the service that fits your needs. We offer tailored solutions to suit every stage and scale of your build.
Let’s Talk
Let’s Talk
We’ll arrange a meeting to understand your goals. This is where we listen, ask the right questions, and get aligned on the vision.
Plan & Prepare
Plan & Prepare
We get everything in place to make it happen. From timelines to technical details, we sort the logistics so you don’t have to.
Delivered With Care
Delivered With Care
Installed. Finished. Handled. Your project is completed to a high standard — with quality, safety and attention to detail at every step.
Longworth Facades
Let’s Talk About Your Next Project
Our expert team is ready to help you plan, design, and deliver with confidence.