Our Work
Alder Hey Hospital

Project Details
Our Client
Galliford Try Construction
Location
Alder Hey Hospital, Off Eaton Road, Liverpool, L12 2AP
Sector
Healthcare
Project Completion
October 2022
Services
Façade and Roofing Installation
Overview
The Alder Hey Community Cluster is a landmark development expanding the hospital’s renowned campus. It brings together world-class outpatient services and a 12-bed inpatient mental health facility, designed with a focus on wellbeing, privacy, and natural connection. The two new buildings—The Catkin Centre and Sunflower House—offer therapeutic environments aimed at supporting children and young people’s mental health in a truly nurturing setting.
Longworth was appointed by Galliford Try to deliver a full façade and roofing package for the new facility, helping shape an architectural statement that’s both practical and deeply symbolic.
Thoughtful Design
Creating spaces with purpose
We believe great design should do more than look good — it should support the people who use it, day in and day out.
Intelligent Solutions
Solving challenges with clarity
From concept through to completion, we think creatively and work collaboratively to deliver smart, buildable solutions.
Reliable Delivery
Built on experience and trust
We manage complexity with confidence — delivering high-quality results on time, on budget, and with minimal disruption.
The Vision
Designed by Cullinan Studio, the project champions nature-inspired architecture and prioritises access to green space and natural light throughout the buildings. Names like ‘Catkin’ and ‘Sunflower’ were chosen by the young people using the services—underlining the emphasis on growth, care, and connection to the outdoors.
The façade materials were carefully selected to complement this vision. A standout feature is the use of Proteus Corten rainscreen cladding—a natural material that weathers over time to reveal rich bronze and copper tones, echoing the garden’s earthy palette.


Design & Delivery
Installing the rainscreen began with a full air-tightness membrane (Proctor Wraptite) across the sheathing board. Due to the SFS frame tolerances, we devised a clever solution involving horizontal ‘C’ channels to support vertical mullions, offering the flexibility to align panels without compromising structural integrity.
The curved elements of the façade were a particular technical challenge. These were surveyed and measured on-site post-frame installation, allowing us to fabricate panels with pinpoint accuracy. Our team worked concurrently on flat sections while the curved pieces were in manufacture, keeping the programme on track.
Managing rainwater runoff from the Corten cladding was also crucial. Working with the architect, we integrated a hidden gutter system behind the base flashing to catch runoff and prevent staining—an important design consideration when using weathering steel.
Start Your Project
Start Your Project
Choose the service that fits your needs. We offer tailored solutions to suit every stage and scale of your build.
Let’s Talk
Let’s Talk
We’ll arrange a meeting to understand your goals. This is where we listen, ask the right questions, and get aligned on the vision.
Plan & Prepare
Plan & Prepare
We get everything in place to make it happen. From timelines to technical details, we sort the logistics so you don’t have to.
Delivered With Care
Delivered With Care
Installed. Finished. Handled. Your project is completed to a high standard — with quality, safety and attention to detail at every step.
Longworth Facades
Let’s Talk About Your Next Project
Our expert team is ready to help you plan, design, and deliver with confidence.